New build of inpatient building with 9 wards (geriatrics, closed and open psychiatric units)
New build of entrance hall, gates, lecture theatre, cafeteria
Technical data:
Sanitary engineering:
Supply of wards
Ward bathroom equipment Hygiene/disinfection
Water softening system
Heating engineering:
District heating distribution system Geothermal energy combined with heat pump
Ventilation and air-conditioning:
Supply air conditioning to patient rooms using heat pump and heat recovery
HVAC lecture theatre with heat recovery and integrated refrigeration
Safety excess pressure ventilation system for fire service lift areas
Electrical engineering:
Equipment according to DIN VDE 0107 NSHV AV/SV
Connection to existing transformer station /N EA
Bus system
Lighting/blinds control
Lighting technology/safety lighting DIN VDE 0108
Communication technology:
Fire alarm system, emergency services system
Electro-acoustics nurse call, emergency call system, media technology in lecture theatre
Access control, data networks, telecommunications system, active components
Building automation:
BA according to technical operating department with BMS/DDC
Lifts - fire service, beds and small freight lifts
Site development
Construction site clearance and relocation of operation
External development for heating, sanitary facilities, electricity, FM
Connection to existing buildings
External lighting
Areas:
- Gross floor area: 8,918 m²
- 1st construction phase
- Construction of beds 5,500 m² NA
- Lecture theatre 1,200 m² NA
- Connectors 400 m² NA
- Renovation of old building
- 4,900 m² NA